The asphalt paving and surface demolition is now complete. The part of the construction fence that zigs and zags will continue to be moved in to align with the rest of the fence.

More street lights will be installed and the lights will be reorganized to allow for more even spacing and consistent light levels.

Construction gates will continue to be installed at each of the pedestrian crossings and at each entrance to the construction site. After the gates are installed the orange fence will be replaced with the wooden construction fence. The gates are installed to allow construction vehicles to move through the site.