WEEK OF 4/14 – 4/18

Vacri is continuing the telecom installation in Bank Alley. The east- west sidewalk near Bank Alley and State St was closed today and will be closed until Tuesday afternoon. The trench in that area is too large plate over and there is more work to be done in the trench before it is backfilled.

The new telecom conduits are also being installed and brought into each building. This work is starting on the north side on the west end. Vacri is sawcutting the sidewalk from the construction fence to the building front, then digging a 3-4’ wide trench. There will be no through traffic on the north side while the telecom work is being done. The entrance to each building will be accessible from either the east or the west when the work is done in front of a building.

Please look up while walking through the Commons. Work areas are marked with an orange barrel, orange fencing and or a barricade. Signs are also posted to help direct people. We apologize for any inconvenience and we thank you for your patience.