ASPHALT TODAY

Asphalt is being poured today on the three north-south pedestrian crossings and at Cayuga Street. The crossings will be temporarily closed while this work is happening. Once poured, plywood will be laid across the asphalt for pedestrians to walk on until the asphalt has cooled.

IMG_1667