WEDNESDAY MAY 7

Three contractors are working on site, Vacri Construction, Power & Construction Group and NYSEG. The only sidewalk area closed today is the north-south sidewalk on the east end near Aurora Street.

IMG_1695[1]

Vacri is putting asphalt down on the dirt patches on the south side. Once the asphalt is down, plywood will be in place so the area can be walked on.

Power & Construction is working on the south side near Center Ithaca installing electrical conduit which will feed the new lighting for the Commons. Sidewalk area is narrower in this work area and passable.

NYSEG is working on the north side between American Crafts and Body Gear installing the new gas main. Sidewalk area is narrower in this work area and passable.